Saturday, August 06, 2011

R&T has got a plush front end...

We are puting miles on the frame, and decided also to increase the speed downhilling, so a lefty is a must and the dust is taking ages to come back to the ground after the Cat treads the trail.

Thursday, July 14, 2011

White Lightning

Pure moonshine, the type of gasoline you need...

Wednesday, July 13, 2011

The cat watches you

Minor details make the difference. Aesthetic combined with the small things that we all wish but don't confess (BB30, PM, tapered headset)


Po' boy workshop...

Gluing carbon tubes into titanium lugs... Alignment checked

The genesis

Everithing starts after the design is ok... the frame construction is the first step, cutting, grinding, brushing, TIG welding, gluing, riveting, drilling, painting, all the processes neded for a R&T frame (not in right order thought)